AOD SCHEDULE REQUEST
FORM TO BE USED TO SCHEDULE DELIVERY AND INSTALL OF ALL NON-UNION PROJECTS
  • - -
  • - -
  • Provide approximate install date or a range of dates that are preferred(8/26/17),(8/26/17-9/4/17), or (Week of 8/26/17)
  • - -
  • EXAMPLE: RDI (1) height adjustable work surface, 58"x64". Remove and dispose of the existing surfaces within the station the HAT is being installed in.
  • ******************ALL THE APPLY*****************
  • ******************ALL THE APPLY*****************
  • ******************ALL THE APPLY*****************
  • ***Install drawings are requested to be in hand (5)five days in advance of the instll