2020 AWPCA Best Operated Water System Applicati
DEADLINE to Enter is: February 14, 2020
  • - -
  • - -
  • Your plant is not eligible if the plant is under construction or if any major construction occurred in the past two(2) years. (Construction is defined as the altering or increasing the plant flow or capacity).
  • A copy of the water supply permit for the system/plant is required with each application. Please upload as an image or pdf file.