EmailMeForm
Porous Asphalt Data Project (Sept/Oct 2026)
Has your agency installed porous asphalt pavements, either open-graded friction course or full-depth porous asphalt? If so, we are asking for your assistance in gathering detailed information about your project(s). Information provided will be incorporated into a Porous Asphalt Guidebook that we are developing for Multnomah County and City of Gresham. Upon completion, this guidebook will be available for download and may be of use to your agency for future porous asphalt projects. We aim to have the guidebook completed in late September or early October.
Currently, we are only interested in porous asphalt projects, not pervious concrete, permeable pavers, or any other form of permeable pavement. If you have multiple projects installed, please consider providing information for at least three of your projects. While the projects you choose to share with us are your choice, at a minimum, we suggest providing your oldest, newest, and highest traffic-volume projects. We understand that the information crosses functional boundaries and will require input from several staff members. Hopefully, you can coordinate internally to provide comprehensive information.
Please complete as many items on the form as possible before submitting the form. If you do not have the information for a specific question, respond DNK or leave it blank.
**You do have the option of "SAVE & RESUME LATER". If you choose this option at the end of the form, you will be provided a unique URL back to your form. BE SURE TO COPY AND SAVE THIS URL You may share this link with members of your team.
If you know of another jurisdiction that has installed porous asphalt, please feel free to forward them a
link to this form
.
Link to this form:
https://www.emailmeform.com/builder/emf/missiongreen/guidebook
YOUR CONTACT INFO
After submitting your form, you will receive a confirmation email with an invitation to submit more projects to be used in our guidebook.
Thank you for your contribution to this project!
**You do have the option of "SAVE & RESUME LATER". If you choose this option at the end of the form, you will be provided a unique URL back to your form. BE SURE TO COPY AND SAVE THIS URL You may share this link with members of your team.
Your name
First
Last
Your email
GENERAL INFO ABOUT YOUR PROJECT
If the requested is unknown, please respond by typing DNK.
Project name
Contracting agency
Project point of contact
POC phone number
###
-
###
-
####
POC email
Date constructed
MM
/
YYYY
Prime contractor
Location of project
SPECIFICS ABOUT YOUR PROJECT
If the info requested is unknown, please respond by typing DNK (do not know).
Road classification
Major Arterial
Secondary Arterial
Collector Arterial
Local Road
Mixed Use Path
Parking Lot
Other - Please describe or type DNK (do not know).
Estimated or actual average daily traffic
Type of porous pavement
Open-Graded Friction Course
Full Depth Porous Pavement
Other - please describe or type DNK (do not know).
Pavement section
Example: 3" porous asphalt, 6" asphalt-treated porous base, 12" of 2" aggregate.
If full-depth porous asphalt, does pavement section have drainage collection system or simple infiltration?
Drainage Collection
Simple Infiltration
If full-depth porous asphalt, was a geotextile fabric included in the section?
Yes
No
CURRENT STATUS
If the info requested is unknown, please respond by typing DNK.
Current pavement management index
Current issues
Rutting
Spalling
Cracking
Loss of permeability
None
Other - Please describe.
Choose all that apply.
SERVICE LIFE
If the info requested is unknown, please respond by typing DNK.
Has pavement reached the end of service life?
Yes
No
When did pavement reach end of service life?
MM
/
YYYY
Criteria for determining end of service life
Pavement management rating
Complaints
Safety concerns
Other - Please describe.
What action was taken to remediate failed pavement?
MATERIALS, PERCENTAGES, AND REQUIREMENTS
If the info requested is unknown, please respond by typing DNK.
Asphalt binder
Example: PG70-22
Specified asphalt percentage by weight
Please give %.
Actual asphalt percentage by weight
Please give %.
Warm mix used?
Yes
No
Compaction requirements for each layer
Special requirements
MTV or windrow
Heated truck beds
Covered truck beds
Minimum placement temperatures
Longitudinal cold joints
N/A (not applicable)
Other - Please describe.
Choose all that apply.
Anti-stripping required -ASTM D3625 test?
Yes
No
Cantabro test required?
Yes
No
Cantabro Less than 20%?
Yes
No
Hamburg test required?
Yes
No
IDT test required?
Yes
No
Retained stiffness equal or greater than 70%?
Yes
No
Drain down test required?
Yes
No
Drain down test utilized?
ASTM D6390-23
AASHTO T 305
ODOT TM 318
Other - Please describe or type DNK (do not know).
Freeze/thaw cycle included in mix design?
Yes
No
Were fibers or recycled asphalt shingles used in mix?
Yes
No
If used, what type of fibers or recycled asphalt shingles?
Mineral
Celluose
Kevlar
Carbon fiber
Recycled asphalt shingles
Other - Please describe.
Choose all that apply.
Was recycled porous asphalt included in the mix design?
Yes
No
If yes, what percent of recycled porous asphalt was used?
Please give %.
Regenerative air or vacuum sweeping required?
Yes
No
Regenerative air or vacuum sweeping frequency
Maintenance performed to date
Patching
Fog seal
Rejuvenator seal
Pothole repair
None
Other - Please describe.
Choose all that apply.
Estimated percent of studded tire vehicles, if applicable.
Please give %.
Pavement lift thickness greater than 2.5 x nominal maximum aggregate size?
Yes
No
Nominal maximum aggregate size
Please give in inches.
Pavement aggregate crushed faces (2 faces) equal or greater than 90%?
Yes
No
Pavement aggregate Los Angeles abrasion - less than 30%?
Yes
No
Mix design percent air voids range
Please give %.
Actual mix percent air voids
Please give %.
TACK COAT
If the info requested is unknown, please respond by typing DNK.
Tack coat applied between layers?
Yes
No
Tack coat application method
Tack coat coverage, gal/sy
Tack coat type
ADDITIONAL INFO
Do you have any additional information or comments you would like to provide?
WHEN USING SAVE & RESUME LATER...
If you choose this option at the end of the form, you will be provided a unique URL back to your form. BE SURE TO COPY AND SAVE THIS URL You may share this link with members of your team.